{"id":310,"date":"2014-12-09T08:08:54","date_gmt":"2014-12-09T08:08:54","guid":{"rendered":"http:\/\/zoldenergiablog.hu\/en\/?p=310"},"modified":"2016-05-05T08:08:52","modified_gmt":"2016-05-05T08:08:52","slug":"worlds-largest-solar-farm-goes-online-in-california","status":"publish","type":"post","link":"http:\/\/zoldenergiablog.hu\/en\/2014\/12\/09\/worlds-largest-solar-farm-goes-online-in-california\/","title":{"rendered":"World&#8217;s Largest Solar Farm Goes Online In California"},"content":{"rendered":"<p>Another giant solar farm has been constructed on desert lands in California, stealing the title of the largest solar plant in the world. The farm, which is called Topaz, recently went online after its final 40-megawatt phase was completed, making it the first 500-plus megawatt solar plant to be up and running in the US.<\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-nsm-1-1594\" src=\"http:\/\/zoldenergiablog.hu\/en\/wp-content\/uploads\/2014\/12\/untitled-300x199.png\" alt=\"\" width=\"300\" height=\"199\" \/><\/p>\n<p><a href=\"http:\/\/zoldenergiablog.hu\/en\/?p=308\">Read more<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another giant solar farm has been constructed on desert lands in California, stealing the title of the largest solar plant in the world. The farm, which is called Topaz, recently went online after its final 40-megawatt phase was completed, making &hellip; <a href=\"http:\/\/zoldenergiablog.hu\/en\/2014\/12\/09\/worlds-largest-solar-farm-goes-online-in-california\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_mi_skip_tracking":false},"categories":[29],"tags":[5,7],"jetpack_featured_media_url":"","_links":{"self":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts\/310"}],"collection":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/comments?post=310"}],"version-history":[{"count":2,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts\/310\/revisions"}],"predecessor-version":[{"id":573,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts\/310\/revisions\/573"}],"wp:attachment":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/media?parent=310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/categories?post=310"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/tags?post=310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}