{"id":668,"date":"2016-06-08T13:15:00","date_gmt":"2016-06-08T13:15:00","guid":{"rendered":"http:\/\/zoldenergiablog.hu\/en\/?p=668"},"modified":"2016-06-08T13:15:00","modified_gmt":"2016-06-08T13:15:00","slug":"a-look-at-apples-insanely-ambitious-tree-planting-plans-for-its-new-spaceship-campus","status":"publish","type":"post","link":"http:\/\/zoldenergiablog.hu\/en\/2016\/06\/08\/a-look-at-apples-insanely-ambitious-tree-planting-plans-for-its-new-spaceship-campus\/","title":{"rendered":"A look at Apple\u2019s insanely ambitious tree-planting plans for its new spaceship campus"},"content":{"rendered":"<p>While construction crews work furiously to finish Apple\u2019s mammoth new headquarters in Cupertino this year, another critical piece of the campus\u2019 design is taking shape 100 miles to the east.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-medium wp-image-nsm-1-2636\" src=\"http:\/\/zoldenergiablog.hu\/en\/wp-content\/uploads\/2016\/06\/valleycrestsunol-800x478-300x179.jpg\" alt=\"\" width=\"300\" height=\"179\" \/><\/p>\n<p><a href=\"http:\/\/zoldenergiablog.hu\/en\/archive\/a-look-at-apples-insanely-ambitious-tree-planting-plans-for-its-new-spaceship-campus\/\">Read more<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While construction crews work furiously to finish Apple\u2019s mammoth new headquarters in Cupertino this year, another critical piece of the campus\u2019 design is taking shape 100 miles to the east. Read more<\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_mi_skip_tracking":false},"categories":[1],"tags":[50,51],"jetpack_featured_media_url":"","_links":{"self":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts\/668"}],"collection":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/comments?post=668"}],"version-history":[{"count":1,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts\/668\/revisions"}],"predecessor-version":[{"id":669,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/posts\/668\/revisions\/669"}],"wp:attachment":[{"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/media?parent=668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/categories?post=668"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/zoldenergiablog.hu\/en\/wp-json\/wp\/v2\/tags?post=668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}